setting of ground

英 [ˈsetɪŋ ɒv ɡraʊnd] 美 [ˈsetɪŋ əv ɡraʊnd]

网络  地基沉降

化学



双语例句

  1. A cementing method of separable setting and variable density is used, with two level controls of safety valve on the ground and downhole;
    采用双凝固井、变密度固井方式,均采用地面和地下两级安全阀控制;
  2. The Reason and Prevention and Cure Measure of Setting of Ground of Soft Soil
    浅谈软土地基下沉的原因与防治措施
  3. A new method and steps of setting up a finite fault source model of a scenario earthquake on an active fault for predicting near-fault strong ground motion are proposed here.
    提出了近断层强地震动预测中建立活断层上设定地震有限断层震源模型的方法和步骤。
  4. After setting, the surfaces of the specimens are ground down using carborundum and alumina.
    凝固之后,样品表面连续用金钢砂或氧化铝磨平。
  5. Re-discussion on Setting Out Curved Start on Bend of Track and Field Ground in Open Race
    关于半圆式田径场弯道不分道跑竞赛项目弧形起跑线画法的研究&再论椭圆式画法
  6. How to Select the Setting of the Ground Distance Relay
    关于接地距离保护配合整定的计算方法
  7. High Moisture Quick Setting Ash Material for Mine Roadway backfill Field measurement and analysis of ground behavior of roadway retained by packing high water content material along goaf side
    高水灰渣速凝材料巷旁充填沿空留巷的试验研究高水材料巷旁充填矿压观测与研究
  8. Process flow sheet and principle of vol-ume setting system of ground tanks are introduced. Errors and uncertainty are analyzed.
    介绍了加油站地罐容积标定系统的工艺流程及工作原理,对系统的误差和系统的总不确定度进行了分析,其系统的误差及总不确定度均符合检定要求。
  9. The setting values of three sections, relative parameters of ground distance protection, setting values table and a requisition can also be printed in Chinese for intelligent management of ground distance protection.
    该程序不仅能完成接地距离保护各段定值及相关参数的整定计算,而且能输出汉化整定方案、全网定值表及定值通知单,实现对接地距离保护的智能管理。
  10. The superposition matrix was computed by setting coordinate of ground tracking net and satellite ground longitude according to the linear state transfer equation of GEO satellite. The main part of the evaluation equation for orbit determination accuracy was calculated by observation arc and sampling interval.
    根据GEO卫星的线性化状态转移方程,通过设定地面跟踪网坐标和卫星星下点经度计算叠加矩阵,由观测弧长和采样间隔直接计算定轨精度评定公式中的主要部分。
  11. According to the requirement of the Rules of Track and Field Athletics the setting out of the curved start on the bend of the track and field ground in open race was analyzed mathematically.
    根据《田径竞赛规则》要求,从数学方面分析了不分道跑竞赛项目弯道弧形起跑线。
  12. Discussion on the setting calculations of stator ground protection based on the third-harmonic voltage criterion
    三次谐波电压型定子接地保护整定计算探讨
  13. By analyzing two external faults causing the maloperation of ground fault protection, this paper represents the necessity and method of checking the setting value of zero-sequence fundamental voltage in ground fault protection for generators.
    该文结合两次区外故障引起发电机定子接地保护误动的分析,阐述了发电机定子接地保护中基波零序电压定值校核的必要性和方法。
  14. For the practice of "cover-excavation consequent operation" method, the setting of the temporary road and the controlling of ground subsidence is the key to ensure the project going on smoothly.
    盖挖顺作法施工中,临时路面的敷设以及控制地表沉降是保证施工顺利进行的重要环节。
  15. And sunshine project through setting remuneration distribution channels management, self channel salesperson incentive compensation reform, electronic channels "experience and find fault" activities of a series of specific channel management activities to ensure the optimization scheme of ground implementation.
    并通过设置分销渠道酬金管理阳光工程、自办渠道营业员薪酬激励改革、电子渠道体验和挑刺活动一系列的具体渠道管理活动来保障优化方案的落地实施。
  16. The foundation isolation method is setting a isolation layer between the foundation base and foundation of the building, to reduce the ground motion transfer to the foundation and the upper structure, to reduce seismic response of buildings, to achieve the purpose of isolation and response.
    地基隔震法是指在建筑物基础与地基之间设置隔震层,来减少地面运动向基础和上部结构的传递,减少上部建筑物的地震响应,达到隔震减震的目的。
  17. It is through setting isolation layer between the upper structure and foundation to isolate or reduce the energy of earthquake ground motion is passed up the structure, in order to ensure the safety and use features of building during the process of earthquake.
    它是通过在上部结构与基础之间设置隔震层来隔离或减少地震地面运动的能量向上部结构的传递,从而保证建筑物在地震作用过程中的安全和使用功能。
  18. The ground limestone shortened the setting time, and the slag powder prolonged the setting time. Moreover, the shortening effect of the ground limestone stronger than the increasing effect of the slag powder.
    石灰石粉缩短了凝结时间,矿粉延长了凝结时间,且石灰石粉缩短时间的效应强于矿粉延长时间的效应。